Skip to content
Back to connectors
US Wind & Solar Farms logo

Connect US Wind & Solar Farms

LiveFeatured

Where US solar farms and wind turbines are already built, from two USGS national databases.

About US Wind & Solar Farms

Screen a state or map area for existing utility-scale solar and wind. Solar records can include facility name, AC and DC capacity, battery storage, tracking type, and year online. Wind records can include turbine location, project name, manufacturer, model, hub height, rotor diameter, and project capacity. Both databases are public-domain USGS releases; USGS publishes the wind data quarterly and the solar data annually, and releases lag installation. Wind rows are individual turbines, so one project returns many rows. Small residential turbines and rooftop solar are out of scope. These are built assets, not evidence that land is for sale, leased, permitted, or able to connect to the grid.

Published byUSGS US Large-Scale Solar Photovoltaic Database (USPVDB) and US Wind Turbine Database (USWTDB)
CoversUnited States and the District of Columbia for solar facilities and United States plus Puerto Rico and Guam for wind turbines
UpdatesScheduled
CredentialsNone of your own

Both databases are USGS/LBNL public-domain data releases. No attribution is required, but USGS asks that each database be cited (see freshness notes for the exact citations).

See what US Wind & Solar Farms cannot tell you →

Connect US Wind & Solar Farms to Claude, ChatGPT, Cursor, and other MCP clients

Pick the tool your team uses for the exact setup steps.

  1. 1

    Open Claude settings

    Launch Claude, click the profile button (bottom left), and go to Settings.

  2. 2

    Access connectors

    Open the Connectors tab, scroll to the bottom, and click “Add custom connector”.

  3. 3

    Name your connector

    Enter any name you’d like for this connector.

  4. 4

    Get the connector URL

    Log in to ParcelOps, open the /mcp page, and copy the connector URL you want to use.

  5. 5

    Add the connector

    Paste the URL into the “Remote MCP server URL” box and click Add.

  6. 6

    Start using

    Your US Wind & Solar Farms connector is ready to use in Claude.